A professionally designed and built custom website typically takes 6 to 12 weeks for a small or mid-sized business. Simple sites can launch in 3 to 5 weeks, while complex sites with ecommerce, integrations, or a lot of custom content can take 3 to 6 months.
The honest answer depends less on the number of pages than on decisions: how clear your goals are, how ready your content is, and how quickly feedback comes back. Here's what each phase involves and how long it usually takes.
Phase 1: Discovery and strategy (1–2 weeks)
Goals, audience, competitors, and the structure of the site. What pages exist, what each one needs to do, and what visitors should do next. Skipping this phase is the most common reason websites run late, because the decisions get made later, in the middle of design.
Phase 2: Content and messaging (1–3 weeks, overlapping)
Copy, photography, and video. This is the most underestimated phase. A site can't be finished until the words and images exist. If you need new photography, plan the shoot early.
Phase 3: Design (2–4 weeks)
Visual direction first, then full page designs for desktop and mobile, often with interactive prototypes so you can click through before anything is built.
Phase 4: Development (2–6 weeks)
Building the site: responsive layouts, animations, CMS setup, forms, integrations, analytics, and the technical SEO and AEO foundations that help you get found.
Phase 5: Testing and launch (1 week)
Cross-browser and device testing, accessibility and performance checks, redirects from your old site, and launch. After launch, a short window for fixes and training on how to update the site.
What makes a website take longer
How to launch faster
Our timeline
At Creationbase, design and development happen in the same studio, so there is no handoff gap between designers and developers, and we shoot photography in-house too. Every project starts with a clear scope, a fixed price, and a schedule you can plan around. See our services or start a project.
FAQs
How long does it take to build a small business website?
Most small business websites take 6 to 12 weeks when professionally designed and built. A simple site with ready content can launch in 3 to 5 weeks.
What slows down a website project the most?
Content that isn't ready, slow feedback, and scope that grows during the project are the most common causes of delays.
Can a website be built in a week?
A template site can. A custom website with strategy, original design, and proper testing realistically needs several weeks to do well.